projectsHomeProjects

  • ,

    Coffee Bluff Marina

    Coffee Bluff Marina is a full service bait and tackle shop that offers everything to do with fishing. We have a strong passion for the sport and we take great pride in providing the community we love with the best possible services at the most affordable prices.  At Coffee Bluff Marina, we offer a boat […]

    Learn More+
  • ,

    Foundation Pile

    New shop being built needed a solid foundation so we drove Steel H-Pile to give them the foundation they needed.

    Learn More+
  • ,

    Moran and Crescent Tugboat Dock

    Myrick Marine was asked to assist with construction of a tugboat dock, including an 800-ft long steel bulkhead for mooring of up to twelve tugboats with electrical and water service, along with a fire suppression system. This project, known as the Moran and Crescent Towing Facility, was conceived by two of the largest towing companies […]

    Learn More+
  • ,

    Movax Sheet Pile Installation

    This job required us to install sheet pile to allow the customer to dig the unsuitable material without risk to employees.

    Learn More+
  • Private Timber Bulkhead

    This is a private timber bulkhead we built in a very tight area. The house being built so close to a steep bank made this job a real challenge. We installed anchors under the house to help hold the wall up and were able to use a mini excavator and skid steer loaders to complete the […]

    Learn More+
  • Bloody Point Groin

    Myrick Marine was contracted by Bloody Point on Daufuskie Island, South Carolina to build a structure to stop erosion and to aid in rebuilding the beach on the ocean side of the island. We built the rock structure designed by Erickson Consulting Engineers from Sarasota Florida. Due to the location of this job, all of the Armor […]

    Learn More+
  • ,

    Isle of Hope Marina

    Myrick Marine constructed and installed all of the floating docks, including piling and gangways, for the busy Isle of Hope Marina. Located directly on the Intracoastal Waterway, it is the last marina and fuel stop for southbound boaters for 93 miles. This marina’s facilities include 4,000 feet of new concrete docks, including 600 feet of […]

    Learn More+
  • ,

    Timber Pile for House Foundation

    72 treated timber pile 50′ in length driven to grade with our Movax vibratory hammer. Owner and General Contractor were pleased with the quick and clean job installing these pile.

    Learn More+
  • Plane Salvage

    Myrick Marine was asked to travel very close to the edge of the ocean, where we assisted in the recovery of a plane that went down in the marsh. Working with specialists from the insurance company, our expert crew used our General Sayler spud barge with its American 7250 crane for this sensitive operation to […]

    Learn More+
  • , ,

    Thunderbolt Marine Building Foundation

    Thunderbolt Marine, a full service yacht repair and refit facility, recently took on the giant task of constructing several brand new world class paint shops. Myrick Marine provided them with the foundation for those buildings by installing the 60′ Steel H-Pile to grade with a diesel impact hammer, as well as by driving timber pile […]

    Learn More+
Page 1 of 512345