Myrick Marine provided installation of concrete pilings to support two high capacity boat hoists and also constructed concrete floating docks secured with concrete piles. Each hoist has a walkway that utilizes hollow core slabs supported by concrete piles. Additionally, an aluminum gangway was built to get from the fixed pier to the floating docks.
