projects

  • Thunderbolt Marina

    Thunderbolt Marina recently upgraded their facility by constructing a new fuel dock. Myrick Marine installed 750’ of extra heavy concrete floating docks and concrete pile to create a first class stop on the Intracoastal Waterway. Thunderbolt Marina is conveniently located just outside Savannah on the Wilmington River in Thunderbolt, Georgia at Intracoastal Waterway Marker #35 […]

    Learn More+
  • ,

    Movax Sheet Pile Installation

    This job required us to install sheet pile to allow the customer to dig the unsuitable material without risk to employees.

    Learn More+
  • Steel H-Pile Mooring Dolphins

    Over the years, Myrick Marine has constructed several mooring dolphins on the  Savannah River. Recently, we installed two dolphins on the Savannah River for ships to tie up their head and stern lines. Each structure consisted of 10 HP14x73 Steel H-Piles that were each 80′ long driven with a diesel impact hammer to grade.

    Learn More+
  • ,

    Thunderbolt Marine 2012 Expansion

    Thunderbolt Marine located in Thunderbolt, GA recently initiated a project to expand the transfer pit used to move vessels on dollies via rail from one railway to another. Myrick Marine was chosen to drive the piling including 24 concrete piles that are 55′ long, as well as an additional 30 concrete piles that are 50′ […]

    Learn More+
  • ,

    Sheetwall Replacement

    If you look at the photos you will see this old wall in Thunderbolt, Georgia had failed. We used a floating crane to remove the old wall and replace it with a new Concrete bulkhead and cap. All of our work was done from the water to insure that this facility did not undergo any […]

    Learn More+
  • Wooden Barge Salvage

    Over the years, many boats had hit an old wooden barge in an area waterway, so the DNR finally decided to have this hazardous obstacle removed. Myrick Marine won the bid and successfully removed this dangerous obstruction that had sunken to just below the waterline.

    Learn More+
  • Ocean Range Marker Replacement

    The US Coast Guard asked for our assistance to replace a Range Marker in the ocean just off Port Royal Sound which is a very dangerous environment with ever changing sea conditions. Myrick Marine collaborated to complete the installation quickly, as the jobsite could become hazardous with very little notice. For this project, Myrick provided […]

    Learn More+
  • Bloody Point Groin

    Myrick Marine was contracted by Bloody Point on Daufuskie Island, South Carolina to build a structure to stop erosion and to aid in rebuilding the beach on the ocean side of the island. We built the rock structure designed by Erickson Consulting Engineers from Sarasota Florida. Due to the location of this job, all of the Armor […]

    Learn More+
  • Ipe Private Dock

    Myrick Marine constructed this private dock using Ipe hardwood for the handrail and the walking surfaces. We installed timber pile for the walkway and fixed pier, and concrete pile was used for the floating dock which was also custom built using Ipe as the deck surface and stainless pile guides.

    Learn More+
  • Concrete dock and wood dock house

    Installation of a concrete fixed pier using pre-stressed concrete pile with concrete pile caps and concrete double tee slabs. Once the concrete was installed we built a wooden dock house to the customer specifications and then installed an Aluminum walkway to the existing floating dock.

    Learn More+